Search:

 

Consultation Workshop on Railway Development Study


(May 23, 2010)
The “Consultation Workshop on Railway Development Study” took place at Kabul Serena Hotel.  Topics of  discussion included the development and acceleration the international trade, improvement of transportation networks in Afghanistan,  providing competitive trade facilities and transit across Afghanistan, and the development plan of a railway that will join major trade centers of Afghanistan to  neighboring countries.

His Excellency Wahidullah Shahrani, the Minister of Mines, and Coordinator of Cluster for Economic & Infrastructure Development, commented during his introduction, “Accelerating of the international trade requires the modernization of roadways and development of transport infrastructures, and, fortunately, the government of Islamic Republic of Afghanistan accepted the strategic goals of regional cooperation of Central Asia which is included the development of six transport routes in the region, and three of that will extend through Afghanistan."

"Currently under construction is  75 Km of railway between Hairatan and Mazar-e-sharef, part of the  first phase of  the northern corridor railway plan. The second and largest stage of this project is generating an additional 1000 Km of railway",said Mr. Shahrani.
Mr. Shahrani added, “The government of Afghanistan has a plan to generate a 2000 Km of railway, which could join the some of the country's major cities to our neighboring countries.”

According to the Railway Development Program of Afghanistan, the first route begins from the port of Shirkhan and passes through the Kunduz and Balkh provinces, ending in Herat province.  It will have two branches originating at Hairatan- Mazar, and, Andkhoi- Aqina.  The second route will begin from Mazar, pass through Polikhomri, Kabul, Jalalabad, and end in Toorkham.  and the  third route in south of the country will begin at Spinboldak/Chaman and end in Kandahar city.

Commenting on some of the technical aspects of the railway, the Minister said, “The internal gauge of the lines is planned to be similar to 1435mm European railways, with a tonnage of 25 tons per axel and a speed of 100-160 Km per Hour. In the areas where a  change of gauge is impossible, there will be special arrangements to replacement cargo. The primary capacity of the railway is 10-12 pairs of daily trains.”

The total cost of the project, including construction, engineering, environmental work, advisory services, and materials is estimated to be 5.938 billion dollars.

Attending the conference were some members of the Cabinet, members of the parliament, foreign ambassadors, representatives of European Union in Kabul, as well as some members of the private sector and international organizations.

  
 What's New

Afghanistan Ministry of Mines Rejects the Kashkari Oil Block Tender

 Opportunities

 Metal price

updates 24 hour-5 years

[Most Recent Quotes from www.kitco.com]

Other metals 

 Newsletter

1

About the Resignation of 11 Staff from the Ministry of Mines

2 1.3 Billion Dollars Income in Next 15 years by Develpement of Mines

 Newsletter Sign up

Submit your e-mail address to recieve Press breifing, Announcements and News.

Home | About Us | Legislations | Organization | Afghan Geological Survey | Enterprises | Opportunities | Picture Gallery | Explorations
News & Reports | International Assistance | Contact Us | Links
All contents copyright 2006-07 rights reserved. Ministry of Mines Afghanistan.
Designed and Hosted by NETLINKS

Home
About Us
Legislations
Organization
Afghan Geological Survey
Enterprises
Opportunities
Picture Gallery
Explorations
News & Reports
International Assistance
Contact Us
Links
News Letter

جمهوری اسلامی افغانستان

وزارت معادن

د افغانستان اسلامی جمهوریت

دکانو وزارت